The future of renewable energy!
For the German regulation "Elektrotechnische-Eigenschaften-Nachweis- Verordnung" (NELEV) and the "Energieanlagen-Anforderungen-Verordnung" (EAAV)
Simplified grid connection of your generation plants – Safely implement the EAAV requirements with ZIEHL
Since May 2024, the new EAAV has simplified and accelerated the connection of generation systems to the grid. Benefit from less bureaucracy and plan larger systems without time-consuming certifications. Thanks to our certified Pav,e monitoring type EFR4002IP and our adapted Grid and Plant protection type UFR1002IP, implementation is more efficient and flexible. You can find our customer information on NELEV and EAAV here hier.
Rely on future-proof power generation – with solutions from ZIEHL.
EFR4002IP
• Certified Pav, e-monitoring with continuous monitoring and switch-off time along the limit curve according to VDE-AR-N
4105:2018-11
• Can be used for medium-voltage applications - Connection of earthed medium-voltage transformers and series-connected measuring devices possible
• Install more generation capacity than the grid connection allows
• simple parameterization